{"id":5066,"date":"2026-07-01T16:17:35","date_gmt":"2026-07-01T08:17:35","guid":{"rendered":"https:\/\/tyi.uin88.com\/about-us\/customer-references\/rrdonnelley\/"},"modified":"2026-07-27T01:44:04","modified_gmt":"2026-07-26T17:44:04","slug":"rrdonnelley","status":"publish","type":"page","link":"https:\/\/tyi.uin88.com\/en\/about-us\/customer-references\/rrdonnelley\/","title":{"rendered":"RR Donnelley partner"},"content":{"rendered":"<div class=\"et_pb_section_0 et_pb_section et_pb_fullwidth_section et_section_regular et_block_section\">\n<section class=\"et_pb_fullwidth_header_0 et_pb_fullwidth_header et_pb_bg_layout_dark et_pb_text_align_left et_pb_module et_flex_module\"><div class=\"et_pb_fullwidth_header_container left\"><div class=\"header-content-container center\"><div class=\"header-content et_flex_module\"><h1 class=\"et_pb_module_header\">Reference case \u00b7 RR Donnelley Partnership<\/h1><div class=\"et_pb_header_content_wrapper\"><p>PNX Software has been serving as the preferred supplier to RR Donnelley for a decade, delivering system software development services over the past 10 years. For RR Donnelley\u2019s Asia region, we have deployed integrated solutions spanning prepress media, digital production management, and order fulfillment \u2014 establishing a comprehensive digital management ecosystem that covers the entire customer\u2011to\u2011delivery lifecycle.<\/p>\n<\/div><div class=\"et_pb_header_button_wrapper\"><\/div><\/div><\/div><\/div><div class=\"et_pb_fullwidth_header_overlay\"><\/div><div class=\"et_pb_fullwidth_header_scroll\"><\/div><\/section>\n<\/div>\n\n<div class=\"et_pb_section_1 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_0 et_pb_row et_block_row\">\n<div class=\"et_pb_column_0 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_0 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Client Profile: Global Printing Giant<\/h2>\n<p>RR Donnelley, founded in 1864, has grown over 160 years to become the world's second-largest commercial printing company, with annual revenue exceeding $5 billion. As a key part of its global strategy, the Asia region operates 8 major production bases across China and India, serving over a dozen industries including publishing, consumer electronics, finance, retail, and pharmaceuticals.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_1 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_1 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_8_24 et_flex_column_8_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_0 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_top et_pb_module et_flex_module\"><div class=\"et_pb_blurb_content et_flex_module\"><div class=\"et_pb_main_blurb_image\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue0ef<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\">Historical Heritage<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li>Founded in Chicago in 1864; served as the official printer for the 1933 Chicago World's Fair and again for the 2010 Shanghai World Expo.<\/li>\n<li>Listed on the NASDAQ Global Select Market in 2009 (ticker: RRD); currently employs approximately 32,000 people worldwide.<\/li>\n<li>Recognized as one of the global \"Big Four\" in the printing industry, alongside Quebecor (Canada) and Dai Nippon Printing (Japan).<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_2 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_8_24 et_flex_column_8_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_1 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_top et_pb_module et_flex_module\"><div class=\"et_pb_blurb_content et_flex_module\"><div class=\"et_pb_main_blurb_image\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue109<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\">Asia Footprint<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li>Entered China in 1993, with the Shenzhen plant commencing production in 1994. Currently operates 7 factories in China (Shenzhen, Shanghai, Beijing, Dongguan Liaobu, Dongguan Humen, Chengdu, Suzhou).<\/li>\n<li>Established 5 pre-press media centers (Shanghai, Shenzhen, Beijing, Dongguan Liaobu, Guangzhou) and 3 new product development centers.<\/li>\n<li>Service network covers Hong Kong and Taipei, with 1 factory in India, forming a comprehensive Asia-Pacific production capacity layout.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_3 et_pb_column et-last-child et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_8_24 et_flex_column_8_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_2 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_top et_pb_module et_flex_module\"><div class=\"et_pb_blurb_content et_flex_module\"><div class=\"et_pb_main_blurb_image\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue0e3<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\">Business Scale<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li>Asia region annual revenue of approximately USD 640 million, with a total workforce of about 9,000 employees, ranking first among China's Top 100 Printing Companies.<\/li>\n<li>Business spans over a dozen industries including publishing, consumer electronics, finance, retail, automotive, pharmaceuticals, and cosmetics.<\/li>\n<li><span>RR Donnelley serves a broad client base, including retail giants such as <strong>CVS, Home Depot, and Kroger<\/strong>, as well as fashion and cosmetics brands like <strong>NIKE, BURBERRY, FANCL, ONLY, and Macy's<\/strong>.<\/span><\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_2 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_2 et_pb_row et_block_row\">\n<div class=\"et_pb_column_4 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_1 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Business Challenges: Pain Points in Digital Transformation<\/h2>\n<p>During the operation of 8 major production bases across Asia serving over a dozen industries, RR Donnelley faces three core challenges: multi-plant collaboration efficiency, the level of digitalization in pre-press media, and supply chain response speed. As customer demand for personalized printing and short-cycle delivery continues to grow, the traditional pre-press processing model that relies heavily on manual experience, along with the fragmented supply chain management system, urgently requires systematic upgrades.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_3 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_5 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_12_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_3 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_top et_animated et_pb_module et_flex_module\"><div class=\"et_pb_blurb_content et_flex_module\"><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\"><i class=\"fa-solid fa-user-gear\"><\/i> Operational Management Challenges<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li><strong>Complex multi-plant coordination\uff1a<\/strong>Order allocation, capacity scheduling, and inventory management across 7 factories in China still rely on traditional methods, leaving room for improved collaboration efficiency.<\/li>\n<li><strong>Pre-press media processing bottleneck\uff1a<\/strong>High-volume tasks such as high-precision scanning, color management, and file layout are challenged by manual processing efficiency and standardization levels.<\/li>\n<li><strong>Lagging supply chain responsiveness\uff1a<\/strong>Faced with growing customer demand for short-lead-time and quick-turnaround orders, the response chain from order receipt to production is lengthy, requiring systematic support to enable flexible production capabilities.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_6 et_pb_column et-last-child et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_12_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_4 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_top et_animated et_pb_module et_flex_module\"><div class=\"et_pb_blurb_content et_flex_module\"><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\"><i class=\"fa-solid fa-screwdriver-wrench\"><\/i> Technical System Challenges<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li><strong>System silos\uff1a<\/strong>Each factory and each production stage operates on independent systems, making real-time data sharing difficult and creating information silos that hinder decision-making efficiency.<\/li>\n<li><strong>Difficulties in process standardization<\/strong>\uff1aSignificant variations in production workflows across different factories and product lines, with a lack of unified digital standards and a process knowledge base.<\/li>\n<li><strong>Quality traceability system\uff1a<\/strong>Facing high-end packaging clients in industries such as pharmaceuticals and food, there is a need to establish a comprehensive product lifecycle quality traceability system.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_3 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_4 et_pb_row et_block_row\">\n<div class=\"et_pb_column_7 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_2 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Solution: System Implementation Panorama<\/h2>\n<p>We implemented a systematic solution for RR Donnelley Asia covering three core areas \u2014<strong> pre-press media, digital printing production management, and order processing <\/strong>\u2014 building a full-process digital management system from customer order placement to product delivery.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_5 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_8 et_pb_column et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_image_0 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic08.jpg\" title=\"en-yinshua-pic08\" width=\"800\" height=\"431\" srcset=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic08.jpg 800w, https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic08-480x259.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw\" class=\"wp-image-6016\" \/><\/span><\/div>\n\n<div class=\"et_pb_text_3 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h3>Pre-Press Media Center System<\/h3>\n<ul>\n<li>Implemented an automated pre-press processing platform covering the entire workflow of high-precision scanning, color management, design layout, and file management, replacing traditional manual processing models.<\/li>\n<li>Established a standardized color management database to ensure color consistency across multiple factories including Shenzhen, Shanghai, and Beijing, enhancing cross-factory collaboration efficiency.<\/li>\n<li>Deployed file version management and intelligent proofreading systems to reduce rework caused by pre-press errors and shorten the pre-press processing cycle.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_9 et_pb_column et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_image_1 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/ens-yinshua-pic09.jpg\" title=\"ens-yinshua-pic09\" width=\"800\" height=\"429\" srcset=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/ens-yinshua-pic09.jpg 800w, https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/ens-yinshua-pic09-480x257.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw\" class=\"wp-image-6040\" \/><\/span><\/div>\n\n<div class=\"et_pb_text_4 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h3>Production Management Collaboration Platform<\/h3>\n<ul>\n<li>Built a multi-factory production collaboration system enabling capacity visualization management across 7 factories in China, including Shenzhen, Shanghai, Beijing, and Dongguan.<\/li>\n<li>Implemented an intelligent scheduling module that automatically optimizes production plans based on order priority, equipment status, and material inventory, improving equipment utilization.<\/li>\n<li>Established a process knowledge base and standardized workflow system, distilling 160 years of printing expertise into reusable digital process standards.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_10 et_pb_column et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_image_2 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/yinshua-pic10.jpg\" title=\"yinshua-pic10\" width=\"800\" height=\"429\" srcset=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/yinshua-pic10.jpg 800w, https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/yinshua-pic10-480x257.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw\" class=\"wp-image-3458\" \/><\/span><\/div>\n\n<div class=\"et_pb_text_5 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h3>Order Processing System<\/h3>\n<ul>\n<li>Automated processing of digital assets into press control software, enabling real-time order visibility and alerting to optimize order processing efficiency.<\/li>\n<li>Integrated with SAP and Oracle systems, covering orders, products, logistics and delivery, with efficient automation of order and user data as well as supporting data.<\/li>\n<li>Deployed a professional digital asset management system for the management and transfer of large digital files, enabling automated workflows across all participating departments \u2014 from clients, design, workshop, to production.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_4 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_6 et_pb_row et_block_row\">\n<div class=\"et_pb_column_11 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_6 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Implementation Path: Phased Rollout Strategy<\/h2>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_7 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_12 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_accordion_0 et_pb_accordion et_pb_module et_flex_module\">\n<div class=\"et_pb_accordion_item_0 et_pb_accordion_item et_pb_toggle et_pb_module et_pb_toggle_open et_flex_module\"><h2 class=\"et_pb_toggle_title\">Phase 1: Discovery & Blueprint (3 Months)<\/h2><div class=\"et_pb_toggle_content et_flex_module\"><ul>\n<li>Conducted in-depth business research across 8 production bases, interviewing over 200 key personnel.<\/li>\n<li>Designed a system architecture blueprint covering the three major areas of pre\u2011press, production, and logistics.<\/li>\n<li>Completed the pilot environment setup at the Shenzhen plant, forming a viable implementation plan.<\/li>\n<\/ul>\n<\/div><\/div>\n\n<div class=\"et_pb_accordion_item_1 et_pb_accordion_item et_pb_toggle et_pb_module et_pb_toggle_close et_flex_module\"><h2 class=\"et_pb_toggle_title\">Phase 2: Pilot Implementation (6 Months)<\/h2><div class=\"et_pb_toggle_content et_flex_module\"><ul>\n<li>Deployed and migrated data for the pre\u2011press, production, and logistics systems at the Shenzhen plant.<\/li>\n<li>Executed a 2\u2011month parallel operation to validate and ensure a smooth transition from the old to the new system.<\/li>\n<li>Consolidated standardized implementation templates and operating manuals in preparation for broader rollout.<\/li>\n<\/ul>\n<\/div><\/div>\n\n<div class=\"et_pb_accordion_item_2 et_pb_accordion_item et_pb_toggle et_pb_module et_pb_toggle_close et_flex_module\"><h2 class=\"et_pb_toggle_title\">Phase 3: Full Rollout (9 Months)<\/h2><div class=\"et_pb_toggle_content et_flex_module\"><ul>\n<li>Rolled out the system to the plants in Shanghai, Beijing, Dongguan, Chengdu, Suzhou, and India, following a \"domestic first, overseas later\" sequence.<\/li>\n<li>Established regional implementation teams to maintain consistency in implementation quality.<\/li>\n<li>Completed data integration across the entire region, launching the multi\u2011factory collaborative operations platform for Asia.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_text_7 et_pb_text et_pb_bg_layout_light et_pb_module et_flex_module\"><div class=\"et_pb_text_inner\"><p>The project adopted a three\u2011phase strategy of \"Discovery & Design \u2013 Pilot Validation \u2013 Full Rollout,\" completing system deployment across 8 production bases in Asia within 18 months. The 6\u2011month pilot at the Shenzhen plant produced standardized implementation templates that were then rapidly replicated across the other 7 plants.<\/p>\n<\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_13 et_pb_column et-last-child et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_image_3 et_pb_image et_pb_module et_flex_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic11.jpg\" title=\"en-yinshua-pic11\" width=\"800\" height=\"429\" srcset=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic11.jpg 800w, https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic11-480x257.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw\" class=\"wp-image-6022\" \/><\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_5 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_8 et_pb_row et_block_row\">\n<div class=\"et_pb_column_14 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_8 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Implementation Results: Quantified Value Realized<\/h2>\n<p>Through the overall system and digital asset management, RR Donnelley Asia achieved significant results: pre\u2011press processing efficiency increased by 40%, production scheduling efficiency improved by 35%, and inventory turnover rose by 25%. The share of cross\u2011factory collaborative orders grew from 15% to 40%, while the pre\u2011press error rate dropped by 60%. In addition, automated processing and management of outsourced orders were realized. These outcomes fully validate the value of digital systems for multi\u2011factory collaborative operations within a large\u2011scale printing group.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_9 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_15 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_3_5 et_flex_column_3_5_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_5 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_left et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><a href=\"#\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\uf058<\/span><\/span><\/a><\/div><div class=\"et_pb_blurb_container\"><div class=\"et_pb_blurb_description\"><p><strong>40%\uff1a<\/strong>Pre-press media processing efficiency improved, with file processing cycles shortened from an average of 2 days to 1.2 days, and the pre-press error rate reduced by 60%.<\/p>\n<\/div><\/div><\/div><\/div>\n\n<div class=\"et_pb_blurb_6 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_left et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><a href=\"#\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\uf058<\/span><\/span><\/a><\/div><div class=\"et_pb_blurb_container\"><div class=\"et_pb_blurb_description\"><p><strong>35%\uff1a<\/strong>Production scheduling efficiency improved, with Overall Equipment Effectiveness (OEE) rising from 68% to 82%, and on-time delivery rates reaching 95%.<\/p>\n<\/div><\/div><\/div><\/div>\n\n<div class=\"et_pb_blurb_7 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_left et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><a href=\"#\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue052<\/span><\/span><\/a><\/div><div class=\"et_pb_blurb_container\"><div class=\"et_pb_blurb_description\"><p><strong>25% \uff1a<\/strong>Inventory turnover improved, with raw material inventory days reduced from 45 to 34 days, freeing up approximately USD 8 million in working capital.<\/p>\n<\/div><\/div><\/div><\/div>\n\n<div class=\"et_pb_blurb_8 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_left et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><a href=\"#\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue052<\/span><\/span><\/a><\/div><div class=\"et_pb_blurb_container\"><div class=\"et_pb_blurb_description\"><p><strong>40%\uff1a<\/strong>The share of cross\u2011factory collaborative orders increased from 15% to 40%, enabling dynamic capacity allocation and rapid response to urgent orders.<\/p>\n<\/div><\/div><\/div><\/div>\n\n<div class=\"et_pb_blurb_9 et_pb_blurb et_pb_bg_layout_light et_pb_blurb_position_left et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><a href=\"#\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\ue052<\/span><\/span><\/a><\/div><div class=\"et_pb_blurb_container\"><div class=\"et_pb_blurb_description\"><p><i class=\"fa-solid fa-database\"><\/i> A digital process standards library has been established across 8 factories, capturing over 5,000 standardized process parameters.<\/p>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_16 et_pb_column et-last-child et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_2_5 et_flex_column_2_5_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_text_9 et_pb_text et_pb_bg_layout_light et_pb_module et_flex_module\"><div class=\"et_pb_text_inner\"><p>Key Efficiency Indicator Improvement Comparison (%)<\/p>\n<\/div><\/div>\n\n<div class=\"et_pb_image_4 et_pb_image et_pb_module et_flex_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic06.jpg\" title=\"en-yinshua-pic06\" width=\"520\" height=\"406\" srcset=\"https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic06.jpg 520w, https:\/\/tyi.uin88.com\/wp-content\/uploads\/2026\/07\/en-yinshua-pic06-480x375.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 520px, 100vw\" class=\"wp-image-6019\" \/><\/span><\/div>\n\n<div class=\"et_pb_text_10 et_pb_text et_pb_bg_layout_light et_pb_module et_flex_module\"><div class=\"et_pb_text_inner\"><p>\u25b2 Source: RR Donnelley Asia Regional Operations Annual Report<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_6 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_10 et_pb_row et_block_row\">\n<div class=\"et_pb_column_17 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_11 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Client Value: Strategic-Level Deeper Benefits<\/h2>\n<p>The system implementation not only delivered immediate operational efficiency gains for RR Donnelley, but also built three core strategic capabilities: establishing a replicable digital factory construction model to support future M&A integration; achieving the digital preservation and inheritance of 160 years of printing process knowledge; and building flexible production capabilities that significantly enhance responsiveness to short-lead-time and quick-turnaround orders in the high-end packaging market, solidifying its industry-leading position.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_11 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_18 et_pb_column et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_10 et_pb_blurb et_pb_bg_layout_light et_pb_text_align_left et_pb_blurb_position_top et_animated et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\uf013<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h3 class=\"et_pb_module_header\">Operational Standardization Capability<\/h3><div class=\"et_pb_blurb_description\"><ul>\n<li>Standardization system: Established a digital operations standard system covering 8 Asian factories, providing a directly replicable implementation template for future new plant construction or M&A integration.<\/li>\n<li>Information integration: Eliminated information silos between factories through systematic data integration, enabling true group-level collaborative operations.<\/li>\n<li>Real-time decision-making: Built a real-time data cockpit, allowing management to monitor capacity, inventory, and delivery status across all factories in real time, accelerating decision-making responsiveness.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_19 et_pb_column et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_11 et_pb_blurb et_pb_bg_layout_light et_pb_text_align_center et_pb_blurb_position_top et_animated et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\uf518<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\">Knowledge Preservation & Succession<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li>Process digitization: Converted printing process knowledge previously dispersed among experienced employees into a systematic digital process library, reducing reliance on individual expertise.<\/li>\n<li>Quality consistency: Established databases for key process parameters such as color management and quality control, ensuring cross-factory and cross-batch product consistency.<\/li>\n<li>Talent development: Formulated standardized operating procedures and training systems, shortening new employee onboarding cycles by 30% and strengthening the talent pipeline.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_20 et_pb_column et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough et_flex_column_24_24 et_flex_column_24_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_blurb_12 et_pb_blurb et_pb_bg_layout_light et_pb_text_align_center et_pb_blurb_position_top et_animated et_pb_module et_block_module\"><div class=\"et_pb_blurb_content\"><div class=\"et_pb_main_blurb_image et_animated\"><span class=\"et_pb_image_wrap\"><span class=\"et-pb-icon\">\uf091<\/span><\/span><\/div><div class=\"et_pb_blurb_container\"><h4 class=\"et_pb_module_header\">Market Competitiveness Enhancement<\/h4><div class=\"et_pb_blurb_description\"><ul>\n<li>Flexible production: Significantly enhanced flexible production capabilities, enabling the ability to undertake more short-lead-time, quick-turnaround, and personalized\/customized orders, expanding high-value-added business.<\/li>\n<li>Premium market: Rapidly meets the strict quality traceability requirements of premium industries such as pharmaceuticals, food, and cosmetics, expanding market share in high-end packaging.<\/li>\n<li>Customer stickiness: Through supply chain collaboration optimization, provides clients with one-stop integrated communication solutions from design to delivery, strengthening customer loyalty.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_section_7 et_pb_section et_section_regular et_block_section\">\n<div class=\"et_pb_row_12 et_pb_row et_block_row\">\n<div class=\"et_pb_column_21 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\">\n<div class=\"et_pb_text_12 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h2>Lessons Learned: Key Success Factors<\/h2>\n<p>The success of the RR Donnelley project was driven by four key factors: sustained commitment and resource allocation from senior leadership, a robust \"pilot-validate-rollout\" implementation strategy, a joint team model that deeply integrated business and technical expertise, and systematic change management with comprehensive user training. These experiences provide a replicable implementation pathway for digital transformation in large multinational manufacturing enterprises.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n<div class=\"et_pb_row_13 et_pb_row et_flex_row\">\n<div class=\"et_pb_column_22 et_pb_column et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_12_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_toggle_0 et_pb_toggle et_pb_toggle_item et_pb_toggle_close et_pb_module et_flex_module\"><h5 class=\"et_pb_toggle_title\"><i class=\"fa-solid fa-user-group\"><\/i> Project Management Factors<\/h5><div class=\"et_pb_toggle_content clearfix et_flex_module\"><ul>\n<li>Secured sustained commitment from RR Donnelley Asia's senior leadership, establishing a project steering committee composed of executives from both sides to ensure efficient decision-making on critical issues.<\/li>\n<li>Adopted a \"pilot plant - proven rollout\" model, using a 6-month pilot at the Shenzhen plant to validate solution feasibility and effectively control risks during full-scale deployment.<\/li>\n<li>Established regional implementation teams across 8 factories, with dedicated project managers at each plant to ensure implementation quality and schedule adherence.<\/li>\n<\/ul>\n<\/div><\/div>\n\n<div class=\"et_pb_toggle_1 et_pb_toggle et_pb_toggle_item et_pb_toggle_close et_pb_module et_flex_module\"><h5 class=\"et_pb_toggle_title\"><i class=\"fa-solid fa-pen-to-square\"><\/i> Change Management Factors<\/h5><div class=\"et_pb_toggle_content clearfix et_flex_module\"><ul>\n<li>Conducted tiered and role-specific user training, designing differentiated training content and formats for management, key users, and frontline operators.<\/li>\n<li>Established a \"system ambassador\" mechanism, cultivating internal experts at each plant to build ongoing system optimization and knowledge transfer capabilities.<\/li>\n<li>Prioritized user experience optimization, continuously iterating system functionalities based on frontline feedback to improve user acceptance and engagement.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n\n<div class=\"et_pb_column_23 et_pb_column et-last-child et_flex_column et_pb_css_mix_blend_mode_passthrough et_flex_column_12_24 et_flex_column_12_24_tablet et_flex_column_24_24_phone\">\n<div class=\"et_pb_toggle_2 et_pb_toggle et_pb_toggle_item et_pb_toggle_close et_pb_module et_flex_module\"><h5 class=\"et_pb_toggle_title\"><i class=\"fa-solid fa-laptop\"><\/i> Technical Implementation Factors<\/h5><div class=\"et_pb_toggle_content clearfix et_flex_module\"><ul>\n<li>Adhered to the principle of \"business-led, technology-enabled,\" with implementation teams composed of business experts and technical specialists in a 1:1 ratio to ensure the system closely aligned with actual business scenarios.<\/li>\n<li>Established unified data standards and interface specifications to ensure data integration across the pre\u2011press, production, and logistics systems, as well as with legacy systems.<\/li>\n<li>Adopted a phased data migration strategy, preserving historical data integrity and ensuring business continuity remained unaffected.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>PNX Software has served as a preferred supplier to RR Donnelley for a decade, delivering system software development services over the past 10 years. For RR Donnelley\u2019s Asia region, we have deployed integrated solutions spanning prepress media, digital production management, and order fulfillment \u2014 establishing a comprehensive digital management ecosystem that covers the entire customer\u2011to\u2011delivery lifecycle.<\/p>\n","protected":false},"author":1,"featured_media":2983,"parent":806,"menu_order":13,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-5066","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/pages\/5066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/comments?post=5066"}],"version-history":[{"count":21,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/pages\/5066\/revisions"}],"predecessor-version":[{"id":6863,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/pages\/5066\/revisions\/6863"}],"up":[{"embeddable":true,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/pages\/806"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/media\/2983"}],"wp:attachment":[{"href":"https:\/\/tyi.uin88.com\/en\/wp-json\/wp\/v2\/media?parent=5066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}